Heat ORC - Geothermal Power Plant in Tura

By Kristof Orosz (thesis)


Functional unit
Parameter
Value
Functional unit
kWh
Parameter
Applicability
range
Balmatt data
Your value
Unit
Description
Installed thermal power
6.6 - 25
6.6
MW
Installed thermal power capacity
Reinjection pump power
0 - 500
350
kW
Power of the reinjection pump
Production pump (ESP) power
200 -1200
600
kW
Power of the production pump (ESP)
Operating hours
5000 - 8500
8000
hours
Yearly operating hours of the plant
Number of injection wells
1 - 2
1
Number of
Number of injection wells
Table 4
Standard Deviation* of simplified models
Impact category
* Standard deviation
Climate change
Freshwater and terrestrial acidification
Freshwater ecotoxicity
Human health - carcinogenic effects
Human health - non-carcinogenic effects
Resources - fossils
Resources - minerals and metals
*the standard deviation provided does not reflect the uncertainty of the estimated value, but the spread in the results when doing a Monte Carlo simulation over the validity ranges of the simplified models' parameters.
Table 5
Your results
Impact category
Value
Unit
Functional unit
Climate change
kg CO2-Eq
kWh heat
Freshwater and terrestrial acidification
mol H+-Eq
kWh heat
Freshwater ecotoxicity
CTUe
kWh heat
Human health - carcinogenic effects
CTUh
kWh heat
Human health - non-carcinogenic effects
CTUh
kWh heat
Resources - fossils
MJ
kWh heat
Resources - minerals and metals
kg Sb-Eq
kWh heat
Median results of the reference LCA model relative to your results
Simplified models results using the case-study data, relative to your results
Reference model comparison
Simplified model comparison (Generalized)